History

Below are photographs of some of my previous jobs. Please click on images to enlarge.

10/07/2002, East Sheen

Exterior

 

Interiors

21/03/2002, Putney

Interiors

31/09/2000, Surbiton

Interiors

This photograph shows the work in progress. The walls and ceiling have been stripped bare in preparation for the plastering and painting. All work is done with great care and planning, with every stage of the work discussed beforehand with the client.

The photograph shows the work completed. The desired effect our client requested has been acheived. The fireplace has been restored to its previous position. The skirting and painting finished to the guaranteed high standard.

The hallway has been completed to the specifications discussed with our client. Care and close attention to detail has been taken to acheive the desired effect.

The passage way, with the hallway (left), the front room (shown above), exterior of the house (shown below), and rooms (not shown here), add a consistent character and overall feel to the house.

Exterior

This photograph shows the work in progress. Great care is taken to complete work in as efficient a manner as possible. Great consideration is taken with the property and neighbouring properties.

The exteriors receive the same attention and high standard as the interiors, for an overall consistent finish.